Key Insights
✓ Comprehensive EPC Solution
The project encompassed a full Engineering, Procurement, and Construction (EPC) package. This included both basic and detailed engineering design for the entire Tank Farm. Key aspects of the design phase covered equipment sizing, statical calculations, intricate 3D piping layouts, as well as sophisticated instrumentation and control systems, coupled with detailed electrical design.✓ Specialized Column and Vessel Construction
A critical component of the project was the fabrication and erection of the 24m Absorption Column, alongside the construction and installation of various 20 bar Pressure Vessels. These are pivotal in the formaldehyde production process.✓ Structural Steel and Equipment Installation
The project demanded the fabrication and erection of a Galvanized Steel Structure. This phase also included the meticulous installation of various equipment (heat exchangers, pumps, ventilators, etc.) ensuring structural integrity and operational efficiency.✓ Multidisciplinary Construction Management
Entegrator played a pivotal role in managing diverse construction disciplines during the project. This included overseeing civil, structural, mechanical, and electrical aspects, ensuring a cohesive and efficient construction process.✓ Utility Requirements for Production
The formaldehyde production process in the plant required a range of utilities. Essential utilities included steam, cooling water, and power, each critical for different unit operations within the production process. This highlighted the plant's complex utility needs to support continuous and efficient production.